Concrete Pad Replacement – Verona Post Office, Verona, WI
Our team removed the damaged concrete pad at the Verona Post Office and prepared the area for a new, durable installation. The replacement pad was poured using 4,000 PSI concrete, reinforced with wire mesh and 1/2-inch rebar for added strength and long-term performance. A protective concrete sealer was applied to enhance the finish and help protect the surface from moisture, wear, and Wisconsin’s changing weather conditions.
The completed work restored a clean, stable surface adjacent to the building while maintaining safe, organized conditions around this active public facility.
Project Completed: August 2026.